When a pipeline company approaches a Pennsylvania landowner, one of the most important questions is often overlooked:

What kind of pipeline is this?

The answer can significantly affect the landowner’s negotiating leverage, condemnation risk, survey issues, compensation strategy, route negotiations, and the protections that should be included in the Pipeline Right-of-Way Agreement.

A gathering pipeline and a FERC-regulated interstate transmission pipeline are not the same thing.

They may look similar on a map. Both may cross private property. Both may involve permanent easements, temporary work space, construction impacts, access roads, restoration, and long-term restrictions.

But the legal and negotiating framework can be very different.

Before signing a pipeline easement, option agreement, survey permission, addendum, or compensation agreement, Pennsylvania landowners should determine exactly what type of project is involved.

What Is a Gathering Pipeline?

Gathering pipelines generally collect natural gas from producing wells or well pads and move that gas toward processing facilities, larger transmission systems, or other downstream infrastructure.

Gathering lines are often associated with local or regional shale development.

They may connect:

  • individual well pads;
  • multiple production units;
  • compressor facilities;
  • processing facilities;
  • meter stations;
  • or larger transmission pipelines.

Gathering pipelines can still create significant property impacts.

A gathering line may involve a permanent easement, temporary work space, timber clearing, crop damage, access roads, drainage issues, above-ground facilities, and future maintenance rights.

The fact that a line is called a “gathering pipeline” does not make the agreement minor.

What Is an Interstate Transmission Pipeline?

Interstate transmission pipelines generally move natural gas across state lines through larger pipeline systems.

These projects may fall under the jurisdiction of the Federal Energy Regulatory Commission, commonly known as FERC.

FERC reviews applications for certificates authorizing interstate natural gas pipeline projects.

A FERC-regulated transmission project therefore presents legal and procedural issues that may not exist in an ordinary gathering-line negotiation.

For the landowner, the most significant difference often involves potential eminent-domain authority.

Why the Difference Matters

The gathering-versus-transmission distinction can affect:

  • whether federal pipeline certification is involved;
  • whether federal eminent-domain authority may arise;
  • the landowner’s ability to refuse;
  • negotiation leverage;
  • timing;
  • survey strategy;
  • route alternatives;
  • compensation;
  • addendum negotiations;
  • and litigation risk.

A landowner should therefore identify the pipeline type before deciding whether to sign, reject, or counter an offer.

Do Not Rely Only on What the Landman Calls the Pipeline

The company representative may describe the proposed line as a gathering line, transmission line, trunk line, lateral, connector, extension, or other industry term.

That description is useful, but it should not be the end of the analysis.

Landowners should ask:

  • Who owns the project?
  • What company will operate the pipeline?
  • Where does the pipeline begin?
  • Where does it terminate?
  • What facilities does it connect?
  • Is a FERC proceeding involved?
  • Has a FERC certificate been requested?
  • Has a FERC certificate been issued?
  • What legal authority does the company claim?

The project’s actual regulatory status matters more than informal terminology.

Gathering Pipelines and Eminent Domain

Gathering pipeline negotiations often present a very different eminent-domain analysis from FERC interstate transmission projects.

Landowners should not assume that a gathering-pipeline company automatically possesses federal condemnation authority.

Federal eminent-domain authority associated with interstate natural gas projects generally arises from the federal certification process.

A company seeking a voluntary gathering-line easement may therefore face very different leverage issues.

That difference can be extremely important.

If the company lacks condemnation authority and truly needs the landowner’s property, the landowner may possess substantial negotiation leverage.

However, eminent-domain issues are fact-specific. Landowners should not rely on a general rule or a landman’s statement. The company’s actual authority must be evaluated for the specific project.

FERC Pipelines and Eminent Domain

Interstate natural gas pipeline projects may be approved through the FERC certificate process.

If a qualifying interstate pipeline company receives the necessary FERC certificate and cannot negotiate the required easement with a landowner, federal law can provide the company with eminent-domain authority, subject to the applicable legal process.

That does not mean the company simply owns the land.

The landowner retains important rights.

And it does not mean negotiation is pointless.

Even where condemnation risk exists, landowners may still be able to negotiate substantially better compensation and far stronger property-protection terms than those contained in the company’s original agreement.

Condemnation Risk Changes Strategy—It Does Not Eliminate Negotiation

When landowners hear the words “eminent domain,” they sometimes assume there is nothing left to negotiate.

That is a mistake.

Even where condemnation authority may ultimately exist, voluntary negotiation can address issues that matter enormously to the property owner.

These may include:

  • route location;
  • permanent easement width;
  • temporary work space;
  • additional work space;
  • access roads;
  • burial depth;
  • drainage;
  • topsoil;
  • crop damages;
  • timber damages;
  • fencing;
  • gates;
  • above-ground facilities;
  • future pipelines;
  • tax consequences;
  • indemnification;
  • insurance;
  • restoration;
  • and final release of unused rights.

The presence of condemnation risk should cause the landowner to negotiate intelligently, not surrender automatically.

Gathering Pipeline Leverage Can Be Significant

A landowner approached for a voluntary gathering pipeline may have substantial leverage.

The strength of that leverage can depend on:

  • alternative routes;
  • nearby environmental constraints;
  • streams and wetlands;
  • terrain;
  • existing pipeline corridors;
  • well-pad location;
  • unit development;
  • timing of drilling;
  • nearby signed agreements;
  • project deadlines;
  • and the company’s ability to reroute.

If the company has no realistic alternative route, leverage may be strong.

If the company can easily reroute around the property, leverage may be weaker.

That is why leverage must be evaluated parcel by parcel.

A FERC Pipeline May Still Have Route Flexibility

A FERC project may involve a proposed or approved route, but landowners should not assume route discussions are always impossible.

Route location can affect:

  • homes;
  • barns;
  • wells;
  • ponds;
  • streams;
  • wetlands;
  • timber;
  • crop fields;
  • access;
  • future building sites;
  • and property value.

Landowners should raise route concerns early.

Once project planning and approvals advance, route changes may become more difficult.

Early involvement is therefore important.

Survey Requests Matter in Both Types of Projects

Both gathering and transmission projects may begin with requests to survey private property.

A survey request may involve:

  • boundary work;
  • wetlands;
  • streams;
  • environmental review;
  • archaeological review;
  • route staking;
  • soil work;
  • geotechnical investigation;
  • or preliminary construction evaluation.

Landowners should not automatically sign a broad right-of-entry agreement.

The landowner should understand:

  • who is entering;
  • why;
  • where;
  • when;
  • what work will be performed;
  • whether vehicles are permitted;
  • whether trees or soil may be disturbed;
  • who pays for damages;
  • and what authority the company claims.

The pipeline type can affect the survey strategy.

Pipeline Option Agreements Require Special Attention

Many pipeline companies do not initially present a final easement.

They present an option agreement.

The option may give the company months or years to decide whether to exercise pipeline rights later.

During that period, the landowner’s property may remain burdened by uncertainty.

The option may also be recorded.

Landowners should consider:

  • option duration;
  • upfront option payment;
  • final compensation;
  • route certainty;
  • number of pipelines;
  • temporary work space;
  • extension rights;
  • termination;
  • and release of recorded documents.

Whether the project is gathering or transmission can affect the landowner’s negotiating position on these issues.

Compensation Should Not Be Evaluated the Same Way in Every Project

There is no single correct pipeline-compensation number for every property.

Compensation should account for the actual burden.

Important factors include:

  • pipeline type;
  • easement length;
  • easement width;
  • permanent acreage;
  • temporary acreage;
  • route location;
  • timber;
  • crops;
  • property development;
  • access roads;
  • above-ground facilities;
  • regional pipeline market;
  • condemnation risk;
  • and negotiation leverage.

A landowner should be cautious about accepting a simple “per-foot” number without evaluating the full agreement.

The Pipeline Agreement Is More Important Than the Check

The compensation check receives attention because it is immediate.

The easement may last for generations.

That makes the legal language critically important.

A pipeline agreement may grant rights involving:

  • more than one pipeline;
  • replacement lines;
  • future lines;
  • additional work space;
  • unlimited access;
  • assignment;
  • third-party use;
  • valves;
  • meter stations;
  • pig launchers;
  • pig receivers;
  • communication equipment;
  • electric facilities;
  • surface structures;
  • and future expansion.

Landowners should know exactly what rights are being granted.

Future Pipeline Rights Should Be Limited

A company may ask for the right to install additional pipelines in the future.

That can dramatically increase the long-term burden on the property.

A landowner agreeing to one pipeline should not automatically give the company a perpetual corridor for multiple future pipelines without separate consent and compensation.

The agreement should address:

  • number of pipelines;
  • replacement rights;
  • future lines;
  • additional compensation;
  • location;
  • width;
  • and whether a new agreement is required.

This issue matters in both gathering and transmission easements.

Above-Ground Facilities Should Be Specifically Addressed

Pipeline agreements may authorize above-ground facilities such as:

  • gas valves;
  • meter stations;
  • pig launchers;
  • pig receivers;
  • signs;
  • fencing;
  • communication equipment;
  • and related structures.

Those facilities can create a much greater visual and operational burden than a buried pipeline.

If the landowner does not intend to allow above-ground facilities, the agreement should prohibit them.

If they are allowed, they should be separately located, compensated, insured, maintained, and subject to removal requirements.

Temporary Work Space Can Be Larger Than the Permanent Easement

Landowners often focus on the permanent easement and overlook temporary construction areas.

Pipeline construction may require:

  • temporary work space;
  • additional temporary work space;
  • access roads;
  • staging areas;
  • spoil areas;
  • stream-crossing work areas;
  • and extra space at difficult terrain.

These temporary rights should be mapped and limited.

A landowner should understand exactly how much property the company may disturb during construction.

Burial Depth Matters

Pipeline depth affects future property use.

Landowners should consider farming, drainage, future roads, utilities, excavation, and ordinary use of the property.

The company’s standard agreement may contain vague depth language.

A negotiated addendum can establish clearer burial-depth requirements and greater protection for special areas.

The required depth should not be left entirely to company discretion when the landowner has leverage to negotiate stronger language.

Drainage, Topsoil, and Restoration Protections Are Critical

Construction may create problems that last far longer than the installation period.

Potential problems include:

  • drainage failure;
  • trench settling;
  • erosion;
  • compaction;
  • topsoil mixing;
  • crop loss;
  • damaged farm lanes;
  • damaged fences;
  • damaged culverts;
  • and poor revegetation.

The agreement should contain specific restoration standards.

A vague promise to restore the property may not adequately protect the landowner.

Taxes and Clean and Green Should Be Addressed

Pipeline activity can create tax consequences.

Pennsylvania landowners with property enrolled in Clean and Green should pay particular attention.

The agreement should address responsibility for:

  • rollback taxes;
  • increased assessments;
  • penalties;
  • interest;
  • and other tax consequences caused by company activity.

The landowner should not assume the company will voluntarily pay these costs if the contract is silent.

Indemnification and Insurance Matter

Pipeline operations create risk.

The agreement should require the company to protect the landowner from claims arising from company construction, contractors, operations, maintenance, environmental issues, access, and related activities.

Insurance provisions should be specific.

Landowners should consider:

  • minimum limits;
  • proof of coverage;
  • contractor coverage;
  • additional insured status where appropriate;
  • and continuation of coverage for as long as company rights remain.

Do Not Sign Because You Are Told the Project Is “Going Through Anyway”

Landowners may hear:

  • “This project is going through.”
  • “Everyone else has signed.”
  • “We can condemn.”
  • “There is no point negotiating.”
  • “The route is final.”
  • “This is the company’s best offer.”
  • “This agreement is standard.”

Those statements should not replace legal analysis.

The landowner should identify the actual pipeline type, legal authority, project status, route, compensation, and agreement terms before making a decision.

Questions Pennsylvania Landowners Should Ask

Before signing a gathering or interstate pipeline agreement, Pennsylvania landowners should ask:

  1. Is this a gathering pipeline or interstate transmission pipeline?
  2. Is FERC involved?
  3. Has a FERC application been filed?
  4. Has a FERC certificate been issued?
  5. What eminent-domain authority does the company actually claim?
  6. Are there alternative routes?
  7. How strong is my negotiation leverage?
  8. Is the route fixed?
  9. What is the permanent easement width?
  10. What temporary work space is required?
  11. Are additional pipelines permitted?
  12. Are above-ground facilities permitted?
  13. What compensation is being offered?
  14. Is compensation competitive for this project?
  15. Are crop and timber damages separately addressed?
  16. Are drainage and topsoil protections adequate?
  17. Are taxes addressed?
  18. Are insurance and indemnification adequate?
  19. What happens when the pipeline is abandoned?
  20. Am I granting the company more rights than it actually needs?

These questions should be answered before signing.

Speak With a Pennsylvania Pipeline Attorney Before Signing

The difference between a gathering pipeline and a FERC-regulated interstate transmission pipeline can materially affect a Pennsylvania landowner’s negotiation strategy, leverage, eminent-domain risk, compensation, and property protections.

At The Clark Law Firm, PC, Attorney Doug Clark represents Pennsylvania landowners and gas-rights holders only. He does not represent pipeline companies.

If a pipeline company, gas company, landman, or surveyor has contacted you about a gathering pipeline, interstate pipeline, survey request, Pipeline Option Agreement, Pipeline Right-of-Way Agreement, compensation offer, or condemnation threat, contact PipelineAttorney.com before signing or granting property rights.